Monday, August 26, 2013

Advantages of FOUNDATION in FPSOs

I came across an interesting article on the use of FOUNDATION fieldbus in a Floating Production Storage and Offloading project. I originally posted it to our LinkedIn group but I thought it was a good piece to also share with everyone on our blog.

The article, by Suresh P. Nair, was featured in a web exclusive by InTech.


The article explains all the benefits of having a "plug and play" technology that allows for quick modular connections of instrumentation in a very confined space. As we all know, space on a sea-bearing vessel comes at a premium so the smaller the footprint of your equipment, the more room for raw product. More raw product is the bottom line.

In the LinkedIn group posting I linked above, Jonas Berge talks about what this type of installation means beyond just FPSOs. The overarching benefit here is with regards to the ability to modular construct FOUNDATION fieldbus projects. While the immediate benefits for this type of application on an FPSO is space savings, weight savings, diagnostics, cabling savings, ease of commissioning etc (you all know the extensive list of benefits of FOUNDATION fieldbus by now), the true benefits are something bigger.

With the ability to modularly construct projects, easier project implementation on site greatly increases. Jonas points out that the ability to modularly construct a project allows the user to "reduce labor at the isolated site where resources are scarce, using manpower in the yard where resources are plenty." There is a powerful message to be learned in that statement. I agree with Jonas that we're not too far off from major mammoth projects being built offsite and shipped modularly for connection. We already see this type of thing happening across other industrial projects like major roadway/bridges and building construction. In fact, many of our regular homes are being built offsite these days with entire walls being pre-fabricated and delivered to site.

Be sure to read the full article on InTech's website here: Advantages of FOUNDATION for FPSOs

Also, be sure to read all of Jonas Berge's insights on the project on our LinkedIn group here: FOUNDATION Fieldbus LinkedIn Group - FPSO



As a side note I can't help but be reminded of the story of a hotel just south of us in San Antonio that is sitting along the riverwalk that was build in a modular fashion for the Texas World Fair in 1968. It took only 46 days to "build" 496 rooms on the 21 story hotel.

Click Image to Read about the Modular Construction of the San Antonio Hotel